Creating ECONOMICAL EXCELLENCE

ON TIME, EVERY TIME

At Kasa Building Group (KBG), we have established a distinguished reputation for delivering exceptional quality, value, and expertise in the commercial and civil construction sector. As a family-owned enterprise, we take immense pride in each of our projects and are certain that you will recognize the difference. Our highly experienced site supervisors work diligently on-site to guarantee the timely and cost-efficient completion of your project.

Start your construction project with KBG

Civil Success built on Results

Safety is paramount in every project we undertake. Our unwavering commitment to creating a secure work environment is evident in our rigorous safety protocols and continuous training programs. We believe that a safe site is the foundation of successful project delivery, ensuring not only the well-being of our team but also the integrity and longevity of our constructions. Our meticulous attention to safety details has been instrumental in cultivating a culture where every team member is empowered to take responsibility for safety, maintaining a proactive approach to hazard identification and risk management.

Moreover, KBG excels in delivering projects on time, thanks to our thorough planning and exceptional foresight. We pride ourselves on our ability to anticipate challenges and devise proactive solutions, ensuring seamless project progression. Our planning process is detailed and methodical, involving all stakeholders to ensure every aspect is covered. This extreme attention to detail ensures that we not only meet but often exceed our client’s expectations, delivering quality work within the stipulated timelines. Our forward-thinking approach and precision in execution make KBG a unique yet stand out company in Civil.

Featured Projects

KBG cover a wide range of needs from intricate groundwork to major infrastructure projects. Our team is equipped to handle complex challenges, ensuring precision and durability in every project, from extensive earthworks to complete principal contractor works. Committed to innovation and safety, KBG sets the standard for civil construction excellence, delivering impactful solutions across various sectors.

Brendale Data Centre and BESS Connection

A crucial upgrade to South East Queensland’s power infrastructure was lead and completed by KBG in the heart of North Brisbane’s suburbs.

Aldoga Solar Farm Connection

Located in the remote parts of Queensland’s Gladstone region, KBG completed an alternative energy project for the state’s infrastructure.

Completed Projects

Kasa Building Group have completed various projects ranging not only across Queensland but across Australia. From earthmoving to finishing and delivering we have a wide variety of quantifiable experience which is something we are proud we replicate each day onall of our projects.

Chinchilla Banana Bridge BESS Substation

Chinchilla Banana Bridge BESS Substation

KASA Building Group was engaged to construct a full substation feeding off a BESS, the substation consisted of KBG were also engaged for the transmission. 

 KBG also were engaged for the Civil Site Supervision component for a portion of the project. 

Year of engagement and lead time:  2023 – 9 months. 

 

KASA Building Group Structual Steel Power Plant Civil & Commercial construction

Wandoan South Solar Farm Connection

KASA Building Group was engaged to construct a full bay which involved (51) pier foundation (3) dead tank circuit breakers, (16) lattice tower foundations, (2) earth poles, cable trenches, conduits, earthing, earthworks, fencing, drainage, drainage pits.  KBG also were engaged for the Civil Site Supervision component of the project. 

Year of engagement and lead time:  2022 – 4 months. 

Edenvale Solar Farm Connection

KASA Building Group was engaged to construct a full bat which consisted of (34) piers, (3) circuit breakers, drainage, conduits, cable trenches, earthing and a road crossing. KBG were also engaged for the Civil Site Supervision component of the project.  Year of engagement and lead time:  2021 – 3 months.

 

Western Downs & Chinchilla BESS Connection

KASA Building Group was engaged to construct 2 full bays which consisted of (128) piers (10) gantry foundations, (2) circuit breakers, 119m of cable trench, 1086m of conduit. There was also  a technical road and drainage build and (9) transmission line foundations. 

Year of engagement and lead time:  2023 – 9 months.

 

Tarong BESS Connection

Kasa Building Group were engaged to construct a full bay connection in between two existing bays. The bay consisted of 24 piers ,9 pad foundations ,3 dead tank circuit breakers ,1 cbmk ,135m conduit and 2 fibre optic pits .KBG were also engaged to construct the transmission foundations for the connection.

Year of engagement and lead time:  2023 – 4 months.

 

H010 Bouldercombe

KASA Building Group was engaged to construct a spare transformer foundation.  

KBG also were engaged for the Civil Site Supervision component for a portion of the project. 

Year of engagement and lead time:  2023 – 3 months.

Nebo BESS Connection

KASA Building Group was engaged to construct 275/33kV Transformer Bund, Site Oil Drainage Works, Earthing Grid Works, Construction works 275kV, Conduit and Earthgrid including Cable Trench, Cable Pits, Cable Trench and MK, Switchyard Surfacing, Substation Sediment and Erosion Control. Year of engagement and Lead time: August 2023 – 1 year.4 Months.

Bouldercombe Battery Project

KASA Building Group was engaged to construct a full battery yard a large access road and a MRTS slip lane the slip lane entry and road widening on Burnett Highway at the Bouldercombe Substation entrance. 

Year of engagement and lead time:  2022 – 7 months.

Aldoga Solar Farm Connection Works

KASA Building Group was engaged to construct the transmission line foundations and the feeder bay from the Aldoga Solar Farm to the Larcom Creek Substation.  There were (46) foundations in total and KBG completed this project 1 month under Practical Completion.

Package 1 year of engagement and lead time:  2024 – 4 months. 

Package 2 year of engagement and lead time:  2024 – 3 months.

Brendale Data Centre and BESS Connection

KASA Building Group was engaged to construct a full yard extension of the South Pine Substation in Brendale.

 KBG also were engaged for the Civil Site Supervision component for a portion of the project. 

Year of engagement and lead time:  2024 – 9 months.

 

Rye Park Switching Station

KASA Building Group was engaged to prepare the laydown area, installation of capping layers including sub-base and base course for switchyard bench and buffer, external Spur Access Road from the switching station main vehicle gate up to 20m outside towards the Wind Farm access track, drainage systems, conduits, pits, erosion and sediment control, landscaping of blue metal aggregate. KBG were also engaged to erect (6) concrete poles one of them being a three sectional pole.  

Year of engagement and lead time:  2022 – 4 months. 

Wellington North Solar Farm

KASA Building Group was engaged to construct (2) transformer builds and (36) transmission line foundations. 

 Year of engagement and lead time:  2023 – 3 months. 

Pine Gap Substation

KASA Building Group was engaged to construct the Pine Gap Substation 66kV to 33kV Substation, this project was a new build and involved a transformer foundation, cable pits, (1) control room, (2) gantries, (19) pad footings, (23) pier foundations, conduits and drainage. KBG were also engaged to construct the new access road and Civil Site Supervision component of the project in separate packages.

Year of engagement and lead times:  2021 – 7 months. 

 

Riverview Resource Recovery Centre Pit Repair (Ipswich City Council)

KBG were engaged by Ipswich city council for a full refurbishment of the waste facility bin at then Riverview resource centre.

KBG also were engaged for the Civil Site Supervision component for a portion of the project. 

Year of engagement and lead time:  2024 – 2 months.